Keep the work area recognizable
A close-up needs a wider view. Photograph the floor, zone, or asset first, then the detail. Add a short work reference so someone reviewing the record later can find the same area.
Capture the stages that matter
Build a repeatable photo routine around the job. Record visible installation details before they are covered, then return to a similar viewpoint for progress updates.
- Before: work area and initial condition.
- During: installation details and items needing attention.
- After: finished work and any remaining action.
Give crews a shared photo format
Use Timeprint watermarks for time and location, with notes for the project, floor, and work stage. Choose a layout that keeps the detail visible and share the template with teammates.
Prepare the handover as work progresses
Keep the relevant photos in the project’s TeamSpace record. Select a clear sequence for sharing or a PDF report, and identify outstanding items separately from completed work.

